An An Integrated Risk Management Approach to Delay Risk in the Procurement Project of an Accommodation Work Barge Using FMEA Method
DOI:
https://doi.org/10.33395/owner.v10i1.3007Keywords:
Risk Management, FMEA, Accommodation Work BadgeAbstract
This study aims to evaluate and design a risk management approach to address delay risks in the procurement project of an Accommodation Work Barge (AWB) at PT XYZ, a maritime company supporting the national oil and gas industry. The research applies the Failure Mode and Effects Analysis (FMEA) method integrated with the principles of ISO 31000:2018, using a qualitative case study approach. Data were collected through in-depth interviews, field observations, open-ended questionnaires, and project documentation. The results identified 18 potential risks across various project stages, from planning to execution. These risks were classified into three priority levels based on their Risk Priority Number (RPN): high priority (RPN > 200), medium priority (100 < RPN ? 200), and low priority (RPN ? 100). The highest-ranked risks included delays in the delivery of critical equipment, failure in coordination with external vendors, and weak oversight in vessel quality inspection procedures. Proposed mitigation measures include strengthening logistical control, implementing performance-based vendor evaluation, and enhancing technical SOPs and interdepartmental communication. This research contributes by providing an evaluative framework that can be utilized by similar companies to systematically identify, assess, and mitigate project risks. The recommendations aim to support the efficiency of procurement processes and reduce the likelihood of delays that may impact financial and operational performance.
Downloads
References
Adebayo, O. T. (2024). Project risk management penanganan: Best practices for identifying, assessing, and mitigating risks in project management. IRE Journals, 7(10).
Albarraq, A. (2023). Risk management framework analysis. IJETI, 4(00047).
Baroroh, I., Setiawan, E., & Susanto, R. (2023). Analisis risiko keterlambatan proyek perbaikan kapal menggunakan metode FMEA (Failure Mode and Effect Analysis). Repository ITS. https://repository.its.ac.id/
Carlson, C. S. (2022). Effective FMEAs: Achieving safe, reliable, and economical products and processes using Failure Mode and Effects Analysis. Wiley.
Chapman, R. J. (2020). Simple tools and techniques for enterprise risk management (2nd ed.). John Wiley & Sons.
Creswell, J. W., & Poth, C. N. (2022). Qualitative inquiry and research design: Choosing among five approaches (4th ed.). SAGE Publications.
Eichholz, S. G., Armitage, H. M., & Allen, B. J. (2024). Risk management orientation, budgeting, and organizational resilience. Journal of Risk and Financial Management, 17(2), 45–62. https://doi.org/10.3390/jrfm17020045
Fauzan, A. S., & Mujiyati. (2025). Enterprise risk management dan good corporate governance terhadap nilai perusahaan: Studi empiris di sektor energi. ResearchGate.
Hillson, D. (2019). Managing risk in projects (3rd ed.). Routledge.
Hopkin, P. (2018). Fundamentals of risk management: Understanding, evaluating and implementing effective risk management (5th ed.). Kogan Page Publishers.
ISO. (2018). ISO 31000:2018 Risk management – Guidelines. International Organization for Standardization.
Jabbour, C. J. C., & Abdel-Kader, F. (2024). Enterprise risk management in green companies. MDPI.
Kutsch, E., & Hall, M. (2020). Value creation through project risk management: An empirical analysis. International Journal of Project Management, 38(5), 275–287. https://doi.org/10.1016/j.ijproman.2019.09.006
Lestari, N. D. (2024). Pengaruh enterprise risk management terhadap nilai perusahaan. JIE.
Miles, M. B., Huberman, A. M., & Saldaña, J. (2024). Qualitative data analysis: A methods sourcebook (3rd ed.). SAGE Publications.
Patton, M. Q. (2025). Qualitative research & evaluation methods: Integrating theory and practice (4th ed.). SAGE Publications.
Pascarella, G., et al. (2021). Risk analysis in healthcare organizations: Methodological approaches. PMC.
Project Management Institute. (2021). A guide to the project management body of knowledge (PMBOK guide) – 7th edition. PMI.
Ramos, C., de la Cruz, M. P., & González, P. A. (2024). Value creation through the management of project risks and opportunities: A holistic framework for sustainability. Sustainability, 16(2), 753. https://doi.org/10.3390/su16020753
Samodra, R., Santoso, D. S., & Wardhana, A. (2025). Risk management framework for shipbuilding projects in Indonesia. International Journal of Maritime Engineering and Logistics, 12(1), 12–24. https://ejournal3.undip.ac.id
Suwinardi, S. (2020). Manajemen risiko pada proyek. ORBITH: Jurnal Manajemen Proyek dan Teknik Konstruksi.
Stamatis, D. H. (2023). Failure mode and effect analysis: FMEA from theory to execution (2nd ed.). ASQ Quality Press.
Tabrizi, A., & Hashemi, R. (2021). Risk assessment using FMEA in delay management of EPC projects. Journal of Engineering, Project, and Production Management.
Zarei, M., Rabeifar, P., & Rahimi, M. (2019). Application of FMEA in the construction industry: Identifying risks in industrial projects. International Journal of Project Management, 37(4), 445–456.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Elga Madani Hanira, Chaerul D. Djakman

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.